WestWater have successfully won a tender with the Water Corporation for improvements to the existing water treatment facilities in Sovereign Hill and Guilderton, Western Australia.
Sovereign Hill Scheme Upgrades
- Installation of new instrumentation for local and remote monitoring
- Upgrade to bore headworks
- Replacement of Electro-chlorination dosing system
- Upgrades to existing Calgon dosing system
- Additional infrastructure for ground level tank sampling & monitoring
- Installation of new storage shed on site
- Replacement of switchboard and provision for new generator connection
Guilderton Scheme Upgrades
- Upgrades to existing Chlorine dosing system
- Installation of new chlorine analyser system
- Installation of new valving and infrastructure for increased dosing control
- Installation of new off-grid power source and SCADA system for chlorine analyser system
- Upgrades to existing Calgon dosing system
- Installation of new instrumentation for local and remote monitoring
All aspects of the works will be completed in accordance with Water Corporation design standards and Australian Standards.
The project is expected to reach Practical Completion by August 2026.