Inglewood Effluent Pump & Gas Chlorination System

View Project PDF

WestWater were awarded the tender for the Design, Manufacture, Install and Commissioning of a Effluent Pump System to supply recycled water to a new irrigation system on a council block near Inglewood, QLD.

The system comprised of a new transportable module building, fitted out by our expert technical staff with a Switchboard, Control Board with PLC & OIP, Telemetry Control including RTU and SCADA, and Chlorine Gas Equipment utilising WestWater’s very own 12 Volt Electric Emergency Shut-Down System & a Duty Standby pump set. We also installed a new floating pontoon and pond level monitoring system.

WestWater completed the project on-time and within budget, with a extremely happy client.